domain | kurana.lt |
summary | **Summary:**
* Kuranos plant in Pasvalys opened around 20 years ago. * Initially, it was a risky venture for bioethanol and biogas production. * By June 5, 2024, Kurana will operate a waste processing facility at the same location. * This new facility will convert industrial waste that is unsuitable for food or feed, such as mushroom compost and food waste, into valuable products. |
title | Kurana |
description | Kurana |
keywords | problem |
upstreams |
|
downstreams |
|
nslookup | A 79.98.26.76 |
created | 2025-04-19 |
updated | 2025-05-17 |
summarized | 2025-05-17 |
|
|